Remediation - Soil Vapor Extraction / Dual Phase Extraction
Inland Steel / Van Leer Containers / Remediation Technologies, Alsip, IL - Installation of an air sparging system and IHV treatment of hazardous solvent contaminated soils and ground water, removal and replacement of sewer lines.
Bell Fuels / Bascor, Mount Prospect, IL - TRI mobilized its Dual Phase Extraction system to the Bell Fuels site located in Chicago. An interceptor trench, 2 feet wide by 60 feet long by 8 feet deep was excavated to accommodate the 4" slotted PVC. The interceptor trench along with a previously installed vertical extraction well was connected to the DPE system. The purpose of the DPE system was to remove free-product gasoline.
Valspar / Clayton, Rockford, IL - Trenching & installation of 800 feet of HDPE to a series of 10 SVE wells. Fusing of HDPE, connection to well heads & gauge installation.
Remediation – Underground Storage Tanks
Com-Ed / Metcalf & Eddy, Waukegan, IL - Sampling, waste profiling, permitting, excavation, UST removal, T & D of 950 tons of PCB TASCA waste.
Chicago Department Of Environment / Harza, Chicago, IL - 19 UST's were removed and disposed of from four different locations. Excavation, backfill & site restoration.
Calumet City / M&E, Calumet City, IL - 9 UST's were removed and disposed.