Assignments - Site Survey and Mapping - Civil Site Design / MEP Services - LEEDTM Documentation
Client - Lacina Heitler Architects
Larsen Engineers was responsible for site design and MEP services for the 5,500 SF lodge at the YMCA Greenkill camp site. Larsen also provided survey and mapping services. LEED certification is being sought for the project; Larsen will be providing LEED documentation. Larsen Engineers was also responsible for the following LEED design features: Subsurface storm water infiltration; and water conservation measures such as low-flow showers and sensor-controlled, low-flow faucets. Also, use of recycled material, such as recycled concrete, as select fill. Part of the mechanical systems work included on-demand hot water heaters; geothermal heat pumps; and Energy Recovery Ventilators (ERVs). Other design work included: radiant floor heating; LED lights; soil insulation; solar orientation; and dual flush toilets. |